Preventing Water Intrusion: The Critical Role of Surface Water Management and Cladding in NCC 2022 Compliance

In Australia’s diverse and often extreme climate, buildings face constant threats from water intrusion—whether from stormwater, rising damp, or wind-driven rain. The National Construction Code (NCC) 2022 Volume One addresses these challenges through robust requirements in Part F1 and Part F3. These provisions are essential for maintaining the integrity of the building envelope in Class 2 to 9 buildings, ensuring occupant health, structural durability, and long-term performance.

Part F1: Surface Water Management, Rising Damp, and External Waterproofing

Part F1 is designed to mitigate health and structural risks from surface and ground water. The key objective (Clause F1O1) is to safeguard buildings and occupants from redirected surface water, rain penetration, and internal moisture accumulation.

Key Performance Requirements:

  • F1P1: Stormwater with a 5% annual exceedance probability (AEP) must not cause damage or nuisance to adjoining properties.

  • F1P2: More intense stormwater (1% AEP) must not enter the building, with exemptions for non-habitable structures.

  • F1P4: Rising damp must not cause material deterioration or unhealthy conditions.

Deemed-to-Satisfy Provisions (F1D3–F1D8):

  • Design of compliant stormwater drainage systems

  • Use of waterproofing membranes at critical junctions

  • Adequate subfloor ventilation and damp-proofing for floors and walls

Waterproofing consultants are often involved in designing compliant stormwater drainage systems or specifying waterproofing membranes. These measures ensure that moisture control starts from the ground up—a critical step in preventing long-term damage.

Part F3: Roof and Wall Cladding

While Part F1 addresses water from below and around, Part F3 focuses on the top and sides of the building—where wind-driven rain and poor detailing can lead to water ingress.

Objective (F3O1):

To protect building elements and occupants from water penetration through roofs and external walls.

Key Performance Requirement – F3P1:

Roofs and walls (including openings) must be weatherproof, preventing moisture ingress that can lead to dampness, decay, or unsafe conditions.

Verification Methods:

  • F3V1: Introduces performance-based testing (e.g., AS/NZS 4284) for complex façades, balconies, and penetrations.


Deemed-to-Satisfy Provisions (F3D2–F3D5):

  • Specify compliant materials and installation methods for roof coverings, sarking, glazed assemblies, and wall cladding.

  • F3D2 now references external waterproofing requirements from F1D5, reinforcing an integrated approach.

Why NCC Compliance Matters

Water intrusion is a silent destroyer—leading to mould, corrosion, rot, and compromised indoor air quality. Non-compliance with NCC waterproofing and cladding requirements can result in:

  • Costly remediation

  • Insurance disputes

  • Legal liability

By adhering to Part F1 and F3, builders and designers can:

  • Reduce occupant health risks

  • Minimise structural degradation

  • Avoid liability from water damage to neighbouring properties

Build Resilient, Compliant Structures

Compliance with NCC 2022 Volume One Parts F1 and F3 is not just a regulatory requirement—it’s a best practice for building durability, occupant safety, and long-term value. At Weatherproof Consulting, we help you interpret, apply, and document these requirements with confidence.

Need Help with NCC Waterproofing Compliance?

📞 Contact us today to learn how our waterproofing consultants can support your next project.